Rooftop Solar Subsidy & Feasibility in Noida
Double Subsidy Advantage: ₹78,000 PM Surya Ghar CFA + ₹30,000 UPNEDA State Top-up = Total ₹1,08,000 subsidy on 3kW+ rooftop systems.
5 kWh/m²/day
300 Sunny Days₹7.2 / Unit
PVVNL Slab Rate3.1 Years
Fast Capital BreakevenUp to ₹78,000
Direct DBT TransferCalculate Solar Savings for Your Noida Rooftop
Pre-calibrated for PVVNL tariffs (₹7.2/unit) and local sun hours.
Configure Your Property
Live MNRE PM Surya Ghar calculations
Avg Tariff: ₹7.2/unit•Sun Hours: 4.6 hrs/day
Mentioned on your DISCOM electric bill
~85 sq ft needed per kW capacity
4.7 kWp Rooftop Solar Plant
Generates ~558 units/month • Requires 493 sq ft terrace
3 Years
Free power thereafter₹2,53,800
Tier-1 DCR-₹78,000
Direct DBT-₹30,000
State Nodal₹1,45,800
After all subsidies₹48,216 / yr
₹18,72,242
130 Tonnes
Step-by-Step PVVNL Solar Net-Metering Process
Standard turnaround timeline: 30 working days under MNRE single-window protocol.
Register on pmsuryaghar.gov.in with your PVVNL Consumer Account Number and mobile number.
PVVNL reviews distribution transformer capacity and grants approval within 7–10 days.
Mounting of DCR TOPCon/Mono PERC modules, inverter, and 3 chemical earth pits as per CEA standards.
Testing by PVVNL Junior Engineer, net-meter energisation, and automatic DBT credit within 30 days.