Rooftop Solar Subsidy & Feasibility in Mumbai
Huge boom in Housing Society & RWA Common Meter Solar under PM Surya Ghar (₹18,000/kW CFA). Lifts, pumps, and common lighting electric bills dropped to zero.
5.1 kWh/m²/day
300 Sunny Days₹8.6 / Unit
Tata/Adani/BEST Slab Rate3 Years
Fast Capital BreakevenUp to ₹78,000
Direct DBT TransferCalculate Solar Savings for Your Mumbai Rooftop
Pre-calibrated for Tata/Adani/BEST tariffs (₹8.6/unit) and local sun hours.
Configure Your Property
Live MNRE PM Surya Ghar calculations
Avg Tariff: ₹8.5/unit•Sun Hours: 5.1 hrs/day
Mentioned on your DISCOM electric bill
~85 sq ft needed per kW capacity
4.5 kWp Rooftop Solar Plant
Generates ~592 units/month • Requires 383 sq ft terrace
2.8 Years
Free power thereafter₹2,43,000
Tier-1 DCR-₹78,000
Direct DBT₹0
N/A₹1,65,000
After all subsidies₹60,000 / yr
₹23,46,114
138 Tonnes
Step-by-Step Tata/Adani/BEST Solar Net-Metering Process
Standard turnaround timeline: 28 working days under MNRE single-window protocol.
Register on pmsuryaghar.gov.in with your Tata/Adani/BEST Consumer Account Number and mobile number.
Tata/Adani/BEST reviews distribution transformer capacity and grants approval within 7–10 days.
Mounting of DCR TOPCon/Mono PERC modules, inverter, and 3 chemical earth pits as per CEA standards.
Testing by Tata/Adani/BEST Junior Engineer, net-meter energisation, and automatic DBT credit within 30 days.