Rooftop Solar Subsidy & Feasibility in Bengaluru
BESCOM online rooftop interconnection portal allows fast 21-day net metering. Heavy tech corridor villa adoption in Whitefield, Sarjapur, and Indiranagar.
5.3 kWh/m²/day
295 Sunny Days₹7.9 / Unit
BESCOM Slab Rate3.2 Years
Fast Capital BreakevenUp to ₹78,000
Direct DBT TransferCalculate Solar Savings for Your Bengaluru Rooftop
Pre-calibrated for BESCOM tariffs (₹7.9/unit) and local sun hours.
Configure Your Property
Live MNRE PM Surya Ghar calculations
Avg Tariff: ₹7.8/unit•Sun Hours: 5 hrs/day
Mentioned on your DISCOM electric bill
~85 sq ft needed per kW capacity
4.7 kWp Rooftop Solar Plant
Generates ~606 units/month • Requires 425 sq ft terrace
3.1 Years
Free power thereafter₹2,53,800
Tier-1 DCR-₹78,000
Direct DBT₹0
N/A₹1,75,800
After all subsidies₹56,724 / yr
₹22,04,580
141 Tonnes
Step-by-Step BESCOM Solar Net-Metering Process
Standard turnaround timeline: 20 working days under MNRE single-window protocol.
Register on pmsuryaghar.gov.in with your BESCOM Consumer Account Number and mobile number.
BESCOM reviews distribution transformer capacity and grants approval within 7–10 days.
Mounting of DCR TOPCon/Mono PERC modules, inverter, and 3 chemical earth pits as per CEA standards.
Testing by BESCOM Junior Engineer, net-meter energisation, and automatic DBT credit within 30 days.