Solar Quotation Scrutiny & Red-Flag Audit Tool
Got a proposal from a local solar contractor? Test it against our independent MNRE price benchmarks, component safety standards, and DCR subsidy rules before paying an advance.
Quotation Specifications
Enter details from your vendor's proposal
Verified Strong Quotation
₹58,333 / kW
Total: ₹1,75,000₹61,000 / kW
MNRE Tier-1 VettedFAIR (-4%)
BoS Quality: 100/100Detailed Component Analysis & Red Flags
Competitive & Fair Market Pricing
Quoted price of ₹58,333/kW aligns with fair MNRE benchmark rates for this equipment tier.
Next-Gen N-Type TOPCon Technology
Superior temperature coefficient (-0.30%/°C) and lower initial degradation compared to older P-type modules.
DCR & ALMM Certified Modules
Qualifies 100% for PM Surya Ghar Muft Bijli Yojana Central & State DBT direct bank subsidies.
Durable Hot-Dip Galvanized (HDGI) Mounting
Certified for 25+ years rust resistance and high wind speeds up to 150 km/h.
Dedicated Chemical Earthing & LA Included
Compliant with CEA & DISCOM safety standards for lightning and surge protection.
This quotation demonstrates strong technical specifications, fair pricing, and compliance with PM Surya Ghar subsidy guidelines. You can safely proceed to agreement, ensuring payment terms are milestone-linked (e.g. 10% advance, 70% on material delivery, 20% on net-meter commissioning).
The 4 Most Common Solar Vendor Traps in India
Installers quote low prices by buying cheaper imported solar cells. When DISCOM inspectors scan the barcode, your ₹78,000 subsidy is forfeited.
Vendors cut ₹15,000 by using light-gauge pre-galvanized channels instead of Hot-Dip Galvanized Iron (HDGI). These rust through after 3 rainy seasons.
Omitting dedicated chemical earthing pits or a copper-bonded LA leaves your home electronics and inverter vulnerable to direct lightning strikes.
Contracts that exclude DISCOM liaison leave you stuck handling paperwork, meter testing fees, and line inspections for months on your own.
