Step-by-Step PM Surya Ghar Portal Guide (2026)
Detailed end-to-end instructions to register on pmsuryaghar.gov.in, obtain DISCOM Technical Feasibility Approval (TFR), pass inspection, and receive up to ₹78,000 direct bank subsidy.
The 5-Stage Subsidy Lifecycle
Portal Registration & Account Creation
Day 1Visit the official portal pmsuryaghar.gov.in. Select your State, your Electricity Distribution Company (DISCOM), and enter your Consumer Account (CA) Number exactly as printed on your recent electric bill. Validate your registered mobile number via OTP.
Technical Feasibility Approval (TFR)
Day 7 – 15Submit your proposed solar plant capacity (e.g. 3 kW or 5 kW). The local DISCOM subdivision reviews their Distribution Transformer (DT) load capacity. Once sanctioned, your feasibility is approved online without needing physical paperwork visits.
Empanelled Vendor Selection & Contract
Day 15 – 20Select an MNRE-registered installer through the portal. Before signing the agreement, conduct a quotation audit with Solar Adviser to ensure the bill of materials specifies 100% DCR solar modules, 80-micron HDGI mounting structure, and pure copper cabling.
Installation, Earthing & Work Completion Submission
Day 20 – 30Vendor completes mounting of panels, inverter wiring, and installs 3 chemical earth pits + lightning arrester. The installer submits plant photos, module serial barcodes, and the Work Completion Report on the National Portal.
DISCOM Inspection, Net Meter & Direct DBT Credit
Within 30 DaysDISCOM officials visit your premises to inspect the plant, measure earthing resistance (< 5 Ohms), and install the Bi-Directional Net Meter. An online Commissioning Certificate is generated. You submit your bank cancelled cheque, and your ₹78,000 subsidy is transferred straight into your bank via DBT!
Mandatory Document Checklist for DBT Subsidy
Latest Electricity Bill
Paid copy from the last 2 months showing Sanctioned Load and CA number.
Cancelled Bank Cheque
Applicant name and account number clearly pre-printed on the cheque leaf.
Manufacturer DCR Certificate
Supplied by your panel manufacturer certifying Indian cell origin.
Earthing Test Report
Certified resistance reading (< 5 Ohms) signed by a licensed electrical contractor.
Portal Registration FAQs
Need Hands-On Portal Registration Assistance?
Our advisory team guides you through the application to guarantee 100% first-attempt approval.
